Fremont - Southeast Beltway Study
NH-77-3(125) CN 22205

Text Only

Project Contacts | Contactos para este proyecto, si usted tiene preguntas:

Carl Humphrey, Roadway Design Division, 402-479-3842
Paul Wisnieski, Roadway Design Division, 402-479-3880

Project info updated August 2008

IMPORTANT: Some documents may be in PDF, and some may be in DjVu format.
If you do not have the FREE DjVu reader or the FREE Acrobat PDF reader, download it by clicking the appropriate button on the left side panel of this page.

Proposed Construction: This project is a location study and an environmental assessment for a new four-lane beltway near the City of Fremont, Nebraska. The purpose of the project is to improve traffic flow and safety on US-77 via a high-speed beltway around the southeast side of Fremont. The beltway would improve continuity of US-77 and improve the regional connectivity between US-77, US-275, and US-30. The length of the proposed alternative is approximately 3.2 miles.

Related Studies: The project is undergoing an environmental assessment study in compliance with the National Environmental Policy Act and all corresponding regulations and guidelines of the FHWA. This assessment documents the alternatives for the project, including design concepts, and evaluates the potential impacts on the social, economic and biological environments. Traffic studies indicate an average daily volume of 9,400 by year 2035.

Right-of-Way: Permanent right-of-way will be required for the entire length of the project. The permanent right-of-way for the Beltway will be approximately 200 feet wide the entire length of the project. Additional right-of-way will also be needed for side road connections, viaducts, etc.
Phasing: Construction is not scheduled at this time, and phasing options are not under consideration at this time.

Schedule: Earliest construction start date is 2016.

Estimated Cost: The project’s current, preliminary cost estimate is to be determined.