Grand Island - US 281 West
Project # 30-4(140)    Control # 41704

Text Only

Project Contacts:
Mike Owen, NDOR, 402-479-4735
Tony Kessler, NDOR, 402-479-3994


Infomation current as of July 2008

An environmental assessment is being prepared for the two modified alignments. The environmental assessment process will culminate with a location public hearing
sometime in the future. Please check back for updates.

The documents are in PDF, but they are still very large. The items download progressively, which means you will not be able to see all of multi-paged items until the download is complete. Allow adequate download time. If you do not have Adobe Reader please download the FREE READER by clicking on the Acrobat Reader logo on the left sidebar.

Brochure with Location Map, Fact Sheet & Aerials of Both Alternatives
(PDF - 11 M)

English Version of Aerial Views | Spanish Version of Aerial Views
(PDF - 10 M each)

LOCATION:  The project is located on US-30 from just west of Monitor Road and extends east to the existing four-lane divided section just west of the US-281/N-2/US-30 interchange in Grand Island a distance of 3.4 miles.

INTENT OF PROJECT:  The intent of the highway improvement is to serve the projected traffic volumes by upgrading the roadway geometrics to current design standards and increase roadway capacity by providing 4 driving lanes (2 each direction).

SCOPE OF WORK:  The proposed work includes reconstructing the existing US 30 two-lane roadway to a four-lane divided roadway with raised median. 

Alternative “A” Modified:  The new project will be built within the existing corridor shifted to the north to meet separation requirements adjacent to Union Pacific Railroad right-of-way.  The at-grade crossings at Engleman Road, Husker Hwy, and Monitor Road will all be closed.  A new viaduct along Husker Hwy will be constructed as part of the project.   

Alternative “B” Modified:   The new project will be realigned north of the properties adjacent to the existing Highway 30.  New viaducts along Husker Highway and North Road would not be constructed as part of this project. These viaducts could be future projects.  The at-grade railroad crossings at Engleman Road, Husker Hwy, Monitor Road, and North Road would not be closed until the viaduct projects were completed. 

TRAFFIC VOLUME ESTIMATES:

Year

2010

2030

Vehicles per day along US30 at North road

10,640

17,540

Percentage  Heavy Trucks 7%

Estimated year of Construction:  No earlier than 2013 & possibly 2016, depending on the availability of funding

Right-of-Way Needs:

Alternative “A” Modified:  This alternative will require the acquisition of an estimated 27 houses and 13 businesses. 

Alternative “B” Modified:  This alternative will require the acquisition of an estimated 4 businesses and 1 house.

ESTIMATED PROJECT COST:
Alternative “A”:        

$25,100,000  Present Day Dollars (Includes a Husker Highway Viaduct, but not a North Road Viaduct)

Alternative “B”:        

$16,500,000  Present Day Dollars (Does not include a Husker Highway Viaduct or North Road Viaduct)

FUNDING:  80% Federal or State; 20% City for Portion within the City Limits